'10 • SR-T-091
CONNECTION OF REFRIGERANT PIPINGS
[Connection of pipes]
(1) Preparations
(2) Connection
Regarding the change in the sizes of gas side pipes (usage of the variable joints); If the 5.0 kw and 6.0 kw class
indoor units (gas side pipe 12.7) is going to be connected to the operation valves (9.52), variable joints available as
accessories must be applied to the gas side operation valves.
NOTE
Cover the pipes with tape so that dust and sand do not enter the pipe until they are connected.
When connecting the pipes to the outdoor unit, be careful about the discharge of fluorocarbon gas or oil.
Make sure to match the pipes between the indoor unit and the outdoor unit with the correct operation valves.
Remove the flared nuts.
(on both liquid and gas sides)
Install the removed flared nuts to the pipes
to be connected, then flare the pipes.
Indoor
Press
Remove
A
90 ± 0.5°
Dimension A
Liquid side 9.1(mm)
Gas side
 φ
9.52 : 13.2(mm)
 φ
12.7 : 16.2(mm)
(Do not turn)
CAUTION
Do not apply refrigerating machine oil to
the flared surface.
Connect the pipes on both liquid and gas sides.
Tighten the nuts to the following torque.
Liquid side : 14.0 ~ 18.0 N·m (1.4 ~ 1.8 kgf·m)
Gas side (φ9.52) : 33.0 ~ 42.0 N·m (3.3 ~ 4.2 kgf·m)
(φ12.7) : 49.0 ~ 61.0 N·m (4.9 ~ 6.1 kgf·m)
Indoor
Liquid side
Gas side
(Do not turn)
Use a flare tool designed for R410A or a conventional flare tool. Please note that
measurement B (protrusion from the flaring block) will vary depending on the type of a
flare tool in use. If a conventional flare tool is used, please use a copper pipe gauge or a
similar instrument to check protrusion so that you can keep measurement B to a correct
value.
Copper pipe diameter
Clutch type flare tool for
R410A
Conventional
(
R22
)
flare tool
Clutch type Wing nut type
Measurement B
(
mm
)
φ6.35 0.0 ~ 0.5 1.0 ~ 1.5 1.5 ~ 2.0
φ9.52 0.0 ~ 0.5 1.0 ~ 1.5 1.5 ~ 2.0
φ12.7 0.0 ~ 0.5 1.0 ~ 1.5 2.0 ~ 2.5
Measurement B
Flaring
block
Copper pipe
Connecting the Drain Hose
Opposite slope
Traps
Bumps
NOTE
Conduct the installation correctly, and ensure that the water is draining correctly.
It may lead to water leaks.
Tapping screw
Drain hose
Clamp
3
EARTHING WORK
Apply exterior tape and
shape along the place
where the pipes will be
routed. Secure to the
wall with a pipe clamp.
Be careful not to
damage the pipes and
the wires.
Heat insulation for joints
Finish and fixing
Vinyl tape
Cover the joint with
insulation material
for the indoor unit
and tape it.
Position so
the slit
comes on top.
Pipe clamp
Pipes
Crossover wires
Exterior tape
Drain hose
Tapping screw
HEAT INSULATION FOR JOINTS
Earth work shall be carried out without fail in order to
prevent electric shock and noise generation.
The connection of the earth cable to the following
substances causes dangerous failures, therefore
it shall never be done. (City water pipe, Town gas pipe,
TV antenna, lightning conductor, telephoneline, etc.)
GAS LEAK DETECTOR
Indoor unit inspection point
Installation test check points
Check the following points again after completion of the installation, and before turning on the power.
Conduct a test run again and ensure that the unit operates properly. At the same time, explain to the
customer how to use the unit and how to take care of the unit following the instruction manual.
If the compressor does not operate after the operation has started, wait for 5-10 minutes. (This may be due
to delayed start.)
(Three-minute restart preventive timer)
When the air conditioner is restarted or when changing the operation, the unit will not start operating for
approximately 3minutes. This is to protect the unit and it is not a malfunction.
The power supply voltage is correct as the rating.
No gas leaks from the joints of the operation valve.
Power cables and crossover wires are securely fixed to
the terminal board.
Each indoor and outdoor unit is properly connected (no
wrong wiring or piping).
Operation valve is fully open.
Refrigerant has been additionally charged (when the total
pipe length exceeds the refrigerant charged pipe length).
The pipe joints for indoor and outdoor pipes have been
insulated.
Earthing work has been conducted properly.
After installation
Air conditioning and heating are normal.
No abnormal noise.
Water drains smoothly.
Protective functions are not working.
Operation of the unit has been
explained to the customer.
The wireless remote control is normal.
Test run
Check that there
are no gas leaks
from the pipe
joints using a
leak detector or
soap water.
4
TEST RUN AND HANDLING INSTRUCTIONS
5
Seitenansicht 83
1 2 ... 79 80 81 82 83 84 85 86 87 88 89 ... 110 111

Kommentare zu diesen Handbüchern

Keine Kommentare