'10 • SR-T-091
Take care so that installed pipes may not touch
components within a unit.
If touching with an internal component
, it will generate abnormal sounds and/or vibrations.
4) On-site piping work
IMPORTANT
How to remove the side cover
Carry out the on site piping work with the operation valve fully closed.
Give sufficient protection to a pipe end (compressed and blazed, or with an adhesive tape) so
that water or foreign matters may not enter the piping.
Bend a pipe to a radius as large as practical.(R100~R150) Do not bend a pipe repeatedly to correct
its form.
Flare connection is used between the unit and refrigerant pipe. Flare a pipe after engaging a
flare nut onto it. Flare dimensions for R410A are different from those for conventional R407C.
Although we recommend the use of flaring tools designed specifically for R410A, conventional
flaring tools can also be used by adjusting the measurement of protrusion B with a protrusion
control gauge.
Tighten a flare joint securely with a double spanner.
Please remove the screw of a side cover and remove to the front.
A
B
Flared pipe end : A (mm)
Ǿ6.35
Ǿ12.7
Copper
pipe outer
diameter
0
04
91
16.6
Copper pipe protrusion for flaring : B (mm)
Ǿ6.35
Ǿ12.7
Copper
pipe outer
diameter
In the case of a rigid (clutch) type
With an R410A tool With a conventional tool
00.5 1.01.5
CAUTION
Do not apply force beyond proper fastening torque in tightening the flare nut.
Fix both liquid and gas operation valves at the valve main bodies as illustrated on the right, and then fasten them,
applying appropriate fastening torque.
Tightening angle (° )
Tightening torque (Nm)
Ǿ6.35 (1/4")
Ǿ12.7 (1/2")
1418
4961
4560
3045
150
250
Recommended length of a tool handle (mm)Operation valve size (mm)
Use a torque wrench. If a torque wrench is
not available, fasten the flare nut manually
first and then tighten it further, using the
left table as a guide.
Do not hold the valve cap area with a spanner.
5) Air tightness test
Screw
Side cover
3) Refrigerant pipe wall thickness and material
Select refrigerant pipes of the table shown on the right wall thickness and material as specified for each pipe size.
Pipe diameter [mm]
Minimum pipe wall thickness [mm]
Pipe material*
6.35
0.8
O-type pipe
12.7
0.8
O-type pipe
*Phosphorus deoxidized seamless copper pipe ICS 23.040.15, ICS 77.150.30
NOTE
Select pipes having a wall thickness larger than the specified minimum pipe thickness.
2. REFRIGERANT PIPING WORK
1) Restrictions on unit installation and use
Check the following points in light of the indoor unit specifications and the installation site.
Observe the following restrictions on unit installation and use. Improper installation can result in a compressor failure or performance degradation
.
2) Determination of pipe size
Determine refrigerant pipe size pursuant to the following guidelines based on the
  indoor unit specifications.
30m or less
20m or less
20m or less
L
H
H
Gas pipe
Liquid pipe
Ǿ12.7 Ǿ6.35
Flare Flare
Ǿ12.7 Ǿ6.35
Ǿ12.7 Ǿ6.35
L
H
Outdoor unit
Indoor unit
CAUTION
The use restrictions appearing in the table above are applicable to the standard pipe size combinations shown in the table below.
Where an existing pipe system is utilized, different one-way pipe length restrictions should apply depending on its pipe size.
For more information, please see “
5. UTILIZATION OF EXISTING PIPING.
Restrictions
Dimensional restrictions
Marks appearing in the drawing on the right
Main pipe length
When the outdoor unit is positioned higher,
When the outdoor unit is positioned lower,
Elevation difference between
indoor and outdoor units
Outdoor unit connected
Refrigerant piping (branch pipeL)
Indoor unit connected
Plug the end of the pipe with tape, or other
material, and fill the pipe with nitrogen gas.
Only use nitrogen gas (N
2
)
Taping
N
2
Nitrogen
Brazing
Station valve
Primary side Secondary side
0.5MPa
Hand
Relief valve
Nitrogen
gas
Brazing must be performed under a nitrogen gas flow.
Without nitrogen gas, a large quantity of foreign matters (oxidized film) are created,
causing a critical failure from capillary tube or expansion valve clogging.
About brazing
When pipe is brazing.
Model 40, 50, 60