Mitsubishi X250 Spezifikationen Seite 24

  • Herunterladen
  • Zu meinen Handbüchern hinzufügen
  • Drucken
  • Seite
    / 27
  • Inhaltsverzeichnis
  • LESEZEICHEN
  • Bewertet. / 5. Basierend auf Kundenbewertungen
Seitenansicht 23
Preparation for Machine Installation
Preparation for Machine Installation
Check each item, and make sure that no item or order is overlooked
It normally takes one to two months for tooling delivery, so please
place orders as early as possible
If there is any possibility of radio disturbance, refer to the "EDM
Radio Disturbance and Countermeasures", and investigate the
state beforehand. Class C grounding is recommended
Prepare the following air source: 0.5 to 0.7MPa, flow rate of
27R/min or more (36R/min or more when using a built-in spindle,
0.6MPa or more when using EROWA tooling specifications)
Prepare an air hose with inner diameter of φ9 to 10mm (The
coupler socket 20SH is enclosed with the machine)
The standard EA8, EA12V and EA28V specifications do not
require an air source, but the above-mentioned air supply must be
prepared when using the optional built-in C-axis, etc
Confirm the routes inside and outside the factory before delivery
The applications must be filed before the EDM is installed. The
required applications differ according to the region, so contact your
nearest fire department for details
Checklist for machine installation
Oil for EDMs Installation conditions
ENEOS Metal Work EDF-K2
※Contact the manufacturer for the Material Safety Data Sheet.
Product brand
Item
Density g/cm
3
(@15°C)
Ignition point °C (PM)
Kinematic viscosity mm
2
/s (@40°C)
Appearance
Dielectric fluid example (ENEOS Metal Work EDF-K2)
■Installation location
■Grounding work
■Shielded room
3. Preparation of tooling and electrode
4. Training of programmers and operators
5. Confirmation of foundation work and power supply work
6. Confirmation of delivery route
1. Determining the machining details
2. Preparation of installation fixtures
1) Determination of tooling and electrode
2) Order, preparation or manufacture
1) Confirmation of floor area
2)
Confirmation of environment (constant pressure, dust-proof room, measure
for radio disturbance, prevention of external noise)
3) Confirmation of foundation floor
4) Foundation work
1) Traffic restrictions to factory
 Road width
 Entry road
2) Factory entrance and width of gate in factory m
Factory building entrance dimensions (height x width) m × m
1) Select the programmers and operators
2) Apply for training seminars
1) Determine the workpiece
2) Determine the machining site
3) Determine the pre-processing site
4) Determine the post-processing site
1) Plan the installation fixtures
2) Prepare or manufacture the fixtures
7. File applications to fire department
1) Confirm the dielectric fluid amount
2) File applications to fire department (EDMs already installed must also
  be filed.)
Application for "Facility using fire" (fluid amount less than 400
R)
Application for "Low volume hazardous material storage and handling
site" (fluid amount more than 400
R and less than 2,000R)
Application for "General handling site" (fluid amount 2,000
R or more)
5)
Confirmation of power supply (including grounding work), air source
and 
other work completion
Clear and colorless
Select a place that satisfies the following conditions for
installing the EDM.
(1) Room temperature
* Recommended room temperature: 20±1°C (68±2°F)
* Usable temperature range 5 to 35°C (41 to 95°F)
Fluctuation of the temperature will directly affect the
machine accuracy, so to maintain accuracy, select a place
with little temperature fluctuation. Note that the machining
accuracy may be adversely affected in an environment
where the temperature fluctuates by 3°C (5.4°F) or more
within 24 hours, or 1°C (1.8°F) or more within one hour.
Make sure that the machine body is not directly subject to
the airflow from air conditioners or to direct sunlight.
(2) Atmosphere
Install the EDM in an environment with no corrosive gases,
such as acid or salt, or mist, and with low levels of dust.
Abrasive powder from grinding machinery can adversely
affect the machine's sliding sections and drive sections
such as the ball screws, so pay special attention to the
installation place. (Separate the EDM from the grinding
machinery, install in a separate room, etc.)
(3) Humidity
Within 35 to 75%RH (with no dew condensation).
(4) Machine heating value
Use the equipment capacity to calculate the EDM's heating
value required for designing a constant-temperature room.
The above value is a guideline. Consult with the constant-
temperature room maker for details.
(5) Floor vibration
EA Series (EA8, EA30, EA40, EA50), EA12V-A, EA28V-A
* Select an installation floor where vibration and impact will
not be conveyed.
As a reference, the vibration level should have a maximum
amplitude of 5µm or less at a frequency of 10 to 20[Hz].
EA8PV-A, MA2000, VH10
* Select an installation floor where vibration and impact will
not be conveyed.
As a reference, the vibration level should have a maximum
amplitude of 2µm or less at a frequency of 10 to 20[Hz].
* Consult with the contractor or vibration measuring
instrument maker for details on the measuring method.
(6) Foundation
Install the EDM on a floor which can withstand the weight of
the equipment. A concrete floor 400mm (16in) or thicker is
recommended.
(7) Room construction
The room where the EDM is to be installed must be a non-
flammable or fire-proof structure.
Contact your local fire department for details.
(8) Ventilation of combustible vapors
Install a ventilator to effectively remove combustible vapors
and fine powders.
The EDM must always be grounded to prevent external noise,
prevent radio disturbance, and prevent earth leakage.
Class C grounding (grounding resistance 10Ω or less) as set
forth in the Electric Facility Standards is recommended for the
EDM.
(1) Class C grounding (isolated) is recommended (dedicated
grounding for EDM).
Always use one-point grounding (Fig. 1).
Note) Provide isolated grounding for each machine.
(2) Common grounding can be used if noise from other
equipment will not enter through the common grounding.
The grounding cable must be connected independently up
to the grounding station (Fig. 2).
(3) Use a 14mm
2
grounding wire.
Provide a shielded room if the EDM affects televisions or other
communication systems in the area. Observe the following
points when installing the EDM in the shielded room.
(1) Ground the EDM in the shielded room (Fig. 3).
(2) If the EDM cannot be grounded in the shielded room,
connect the EDM's grounding cable to the shielded room's
grounding terminal (through-bolt) as shown in Fig. 4.
(3) Consult with your Mitsubishi Electric sales office or dealer
for details on setting up a shielded room.
Heating value (kW)
= Equipment capacity (kVA) x 0.6
Example: For EA12VM + FP80V, 7.0kVA x 0.6 = 4.2kW
Grounding for other
equipment
Control unit
Machine
body
Machine
body
Shielded room
Control unit
Control unit
Shielded room
Machine body
Control unit
Machine body
Fig. 1 Fig. 2
Fig. 3 Fig. 4
Through-bolt
Within 1m
Dielectric fluid is regulated by related ordinances as a
"Hazardous Class 4 No. 3 petroleum". The designated quantity
set forth by ordinances is 2,000R (depending on the country
and region).
When handling hazardous materials, such as an EDM and
cutting oil, which have a flash point between 70 and 200°C in
the same building, applications must be filed to the fire
department according to the total amount handled.
1. When the total amount of hazardous materials exceeds 2,000R,
  file an application for a "General Handling Site" permit.
2. When the total amount of hazardous materials is between
400R or more and less than 2,000R, file an application for a
"Low-volume Hazardous Material Storage and Handling Site".
3. When the total mount of hazardous materials is less than
400R, file an application as a "Facility using fire".
Refer to the "EDM Fire Prevention Guidelines" and instruction
manual for details relating to EDM dielectric fluid and fire safety
laws.
Sliding surface lubricant (Mobil DTE26 "Exxon Mobil")
Mobil DTE26
Product brand
Item
Density g/cm
3
(@15°C)
Ignition point °C (PM)
Kinematic viscosity mm
2
/s (@40°C)
Appearance
※Contact the manufacturer for the Material Safety Data Sheet.
Table of sliding surface lubricant properties
Table of dielectric fluid properties
Table of dielectric fluid properties
0.881
204
68.0
Yellow
Shell Paraol 250
※Contact the manufacturer for the Material Safety Data Sheet.
Dielectric fluid example (Showa Shell Sekiyu Shell Paraol 250)
92
0.797
2.42
Clear and colorless
Product brand
Item
Density g/cm
3
(@15°C)
Ignition point °C (PM)
Kinematic viscosity mm
2
/s (@40°C)
Appearance
93
0.77
2.2
Always use dielectric fluid which has a flash point of 70°C or more.
Prepare the following dielectric fluid when operating the EDM.
45 46
Product Line-up
Machining Samples
Total Solutions
Machine Specifications
and Options
Advance Series
Functions and Features
EA Series Functions
and Features
Advance Series
Product Introduction
MA, EA Series
Product Introduction
Advance Control Unit
Tooling
64-bit Control Unit
Power Supply/Control
Specifications
Preparation for
Machine Installation
Precautions
Seitenansicht 23
1 2 ... 19 20 21 22 23 24 25 26 27

Kommentare zu diesen Handbüchern

Keine Kommentare