AUTOMATIC TRANSMISSION -
Transmission Control
23-64
INSTALLATION SERVICE POINT
"
A
A
NUT INSTALLATION
1. Put the selector lever in the “N” position.
2. Loosen the adjusting nut, gently pull the transmission
control cable in the direction of the arrow and tighten
the nut.
INSPECTION
23100890097
WIDE OPEN THROTTLE SWITCH CHECK
Switch position
Terminal No.
1 2
OFF
ON
Manual control lever
Nut
OFF
ON
Kommentare zu diesen Handbüchern